logo

All Exams

Notifications

All Exams

Explore All Exams at KGS

All Exams
Home>Current Affairs>Dulhasti Hydel Power Project
Current Affairs made simple.

Current Affairs provides you with the best compilation of the Daily Current Affairs taking place across the globe: National, International, Sports, Science and Technology, Banking, Economy, Agreement, Appointments, Ranks, and Report and General Studies

banner-image

Dulhasti Hydel Power Project

SYLLABUS

GS-3: Infrastructure: Energy, Ports, Roads, Airports, Railways, etc.

Context: Recently, a panel under the Ministry of Environment has approved the 260-megawatt Dulhasti Stage-II hydropower project on the Chenab River in Kishtwar, Jammu & Kashmir.

More on the News

  • The Expert Appraisal Committee on hydel projects under the Union Environment Ministry granted environmental clearance during the committee’s 45th meeting to the 260 MW (2*130 MW) Dulhasti Stage-II hydropower project. 
  • The project will be developed by NHPC Limited at an estimated cost of about ₹3,277 crore.
  • The clearance enables the government to proceed with floating construction tenders for the project.
  • The project parameters were originally designed in line with the Indus Waters Treaty, 1960 provisions governing the Chenab basin.
  • The Centre is expediting several hydropower projects in the Indus basin, including Ratle, Sawalkote, Bursar, Pakal Dul, Kwar, Kiru and Kirthai projects.

Overview of the Dulhasti Stage-II Hydel Power Project

  • Dulhasti Stage-II is a run-of-the-river hydropower project with an installed capacity of 260 MW (2*130 MW).
  • It is an extension of the existing 390 MW Dulhasti Stage-I Hydroelectric Project.
  • Dulhasti Stage-I was commissioned in 2007 and has been operating successfully under NHPC Limited.
  • Stage-II will utilise the existing dam, reservoir and power intake infrastructure of Stage-I.
  • Water will be diverted through a separate tunnel of about 3.7 km length to create pondage for Stage-II.
  • The project includes a surge shaft, pressure shaft and an underground powerhouse.
  • Water for the project will be sourced from the Marusudar River through the Pakal Dul project linkage.
  • The Chenab basin already hosts operational projects such as Dulhasti-I, Baglihar and Salal.
  • Additional projects on the Chenab are under construction, making the basin a major hydropower hub.
  • Dulhasti Stage-II is expected to strengthen regional power supply and support India’s strategic and energy security objectives in the Indus basin.

Significance of the Project

  • Assertion of Water Sovereignty: By advancing construction while the treaty is in "abeyance," India is signalling a shift toward full utilisation of its Himalayan rivers. This serves as a strategic maneuver to use water rights as leverage in regional security and diplomatic relations.
  • Infrastructure Optimisation: The project is highly cost-efficient because it utilises the existing dam and reservoir of Dulhasti Stage-I. This "brownfield" approach allows for a significant increase in power generation capacity (from 390 MW to 650 MW total) with a relatively small environmental footprint.
  • Energy Security for Jammu & Kashmir: The project is a critical component of India’s plan to make the region a hydropower hub. It aims to address chronic power shortages and stimulate local industrial growth through a reliable supply of renewable energy.
  • Strategic Fast-Tracking: The rapid clearance by the Expert Appraisal Committee—shortly after the 1,856 MW Sawalkote project—demonstrates a coordinated effort to create "facts on the ground." This establishes a physical presence on the Chenab river that would be difficult to reverse in future treaty negotiations.

Source:
The Hindu
Indian Express

footer image

The most trusted learning platform on your phone

With our training programs, learning online can be a very exciting experience! Take the next step toward achieving your professional and personal objectives

app-storeplay-store
logo
Khan Global Studies Pvt. Ltd. 5th Floor,
A13A, Graphix 1 Tower B, Sector 62,
Noida, Uttar Pradesh 201309

Course Related Query: enquiry@khanglobalstudies.com Store Related Query: store@khanglobalstudies.com

Get Free Academic Counseling & Course Details

KGS best learning platform

About Khan Global Studies

We love learning. Through our innovative solutions, we encourage ourselves, our teams, and our Students to grow. We welcome and look for diverse perspectives and opinions because they enhance our decisions. We strive to understand the big picture and how we contribute to the company’s objectives. We approach challenges with optimism and harness the power of teamwork to accomplish our goals. These aren’t just pretty words to post on the office wall. This is who we are. It’s how we work. And it’s how we approach every interaction with each other and our Students.


What Makes Us Different

Come with an open mind, hungry to learn, and you’ll experience unmatched personal and professional growth, a world of different backgrounds and perspectives, and the freedom to be you—every day. We strive to build and sustain diverse teams and foster a culture of belonging. Creating an inclusive environment where every students feels welcome, appreciated, and heard gives us something to feel (really) good about.

Copyright 2026 KhanGlobalStudies

Have a question?

Get Free academic Counseling & Course Details

floatButton