SSC Mahapack 2.0 Batch 2025-26 (Bilingual)
Join our SSC Mahapack 2.0 Batch 2025-26 (Bilingual) to boost your Knowledge
10 Apr 2025 12:04 PM
Explore All Exams at KGS
All Exams
Explore All Exams at KGS
Khan Sir Courses
Geography I Polity I History | World Map I Indian Map I Economics I Biology
UPSC & State PSC
UPSC I BPSC I UP-PSC I MP-PSC
State Exams
UP I Bihar I MP | Rajasthan
NEET | JEE | CUET | Boards
NEET | JEE | CUET | Boards
Defence Exams
NDA I CDS I CAPF I AFCAT I SSB I Agniveer
Police Exams
UP SI | Bihar SI | Delhi Police | UP Constable
SSC Exams
CGL I CPO I CHSL I MTS I SSC GD I Delhi Police
Foundation Courses
Physics I Chemistry I Biology I History I Geography I Polity I NCERT I Math I English | Map I Reasoning
Railway Exams
RRB | RPF
Teaching Exams
TET | Teaching | UGC
Banking Exams
SBI | RBI | IBPS
Engineering Exams
Civil | Electrical | Mechanical
Current Affairs provides you with the best compilation of the Daily Current Affairs taking place across the globe: National, International, Sports, Science and Technology, Banking, Economy, Agreement, Appointments, Ranks, and Report and General Studies
Syllabus:
GS3: Infrastructure: Energy, Ports, Roads, Airports, Railways etc.
Context:
Janasu tunnel on the Rishikesh-Karnaprayag line marked a major milestone towards what is called to be the longest transport tunnel in India..
More on the News
The 14.58 km long tunnel no. 8 or the Janasu tunnel, falls on the Devprayag to Janasu stretch of the Rishikesh-Karnaprayag line.
Janasu tunnel overtakes the 12.75 km long rail tunnel, between Khari and Sumber Stations on the Katra-Banihal Section of the Kashmir line or the Udhampur-Srinagar-Baramulla Rail Link (USBRL).
This is the first tunnel built by using a tunnel boring machine (TBM especially used in Hard rocks) in the Himalayan terrain.
Along with TBM, the New Austrian Tunnelling Method (NATM) has also been used for controlled and small-scale excavation.
The TBM has tunnelled 10.4 km in tunnel no. 8, with 4.11 km excavated through NATM.
Rail Vikas Nigam Limited (RVNL), a public sector undertaking under the Ministry of Railways is the nodal organization of the project.
Rishikesh-Karnaprayag rail link project
Infrastructure Details
The alignment includes 12 new railway stations and 16 main tunnels.
It will also have 19 major bridges to navigate rivers and valleys.
12 escape tunnels covering 97.72 km will be built alongside the main tunnels for emergency evacuation.
7.05 km of cross passages will link the main and escape tunnels.
Geological Feature:
Significance of the Project
Mains Practice Question
Q: Discuss the environmental and strategic significance of the Rishikesh-Karnaprayag railway line project in the context of railway expansion in the Himalayan region.
PYQ: Why is Public Private Partnership (PPP) required in infrastructural projects? Examine the role of PPP model in the redevelopment of Railway Stations in India. (2022)
NCERT Books
Resources
We love learning. Through our innovative solutions, we encourage ourselves, our teams, and our Students to grow. We welcome and look for diverse perspectives and opinions because they enhance our decisions. We strive to understand the big picture and how we contribute to the company’s objectives. We approach challenges with optimism and harness the power of teamwork to accomplish our goals. These aren’t just pretty words to post on the office wall. This is who we are. It’s how we work. And it’s how we approach every interaction with each other and our Students.
Come with an open mind, hungry to learn, and you’ll experience unmatched personal and professional growth, a world of different backgrounds and perspectives, and the freedom to be you—every day. We strive to build and sustain diverse teams and foster a culture of belonging. Creating an inclusive environment where every students feels welcome, appreciated, and heard gives us something to feel (really) good about.
Get Free academic Counseling & Course Details